City utility · Illinois
Chicago: The city owns the service to the external shut-off in the parkway; the owner owns it from there into the home
Chicago's 2020 announcement of its lead programs quotes the municipal code: the service from the water main to the external shut-off valve, usually under the parkway, is owned and maintained by the city. From that valve into the home, the service is the owner's. The 2024 water quality report tells you to call 311 for a leak, and says a Department of Water Management investigator decides whether the break is on the public side or the private side.
Last verified against the official pages listed below. If a number is not on those pages, it is not on this one.
- Property owner
- Utility or city
- Not assigned by the page we read
Open this place in the checker Chicago Department of Water Management
The 2024 water quality report says to call 311 to report a break or leak on the service line: 311
Chicago's parkway shut-off is the city's edge
The September 10, 2020 city announcement is the page that states the split in plain language and ties it to the municipal code. The city owns and maintains from the water main to the external shut-off, usually under the parkway. The owner owns and maintains from that valve into the home. The announcement was about two assistance paths: an equity program and a homeowner-initiated program. The equity path, as described in 2020, was a free full replacement for an owner-occupant under an income test, with lead above 15 parts per billion in a Department of Water Management test. The announcement gave $72,800 for a family of four as 80 percent of area median income at that time. That dollar is a 2020 figure. We are not reprinting it as this year's income limit. Confirm eligibility with the city.
Single-family homes and two-flats on that equity path were also offered a free water meter if they did not already have one. That is a 2020 program detail, useful because it shows the meter was not assumed to be in every house.
The 2024 consumer confidence report tells a house or two-flat built before 1986 that a lead service is likely, and it points to the inventory at SLI.ChicagoWaterQuality.org. Likelihood is not a material test. The inventory is the lookup.
A Chicago leak is sorted public side from private side
The 2024 report's leak instructions are operational. Call 311. An investigator identifies whether the leak or break is on the public side or the private side. The department completes the repair on the public side. The property owner is responsible for repairs on the private side. For a leaking or broken lead service, the report also describes a free lead-service replacement and a new water meter, for any building type, and says the department or a contractor will discuss scheduling that replacement with the owner.
So a leak has two possible endings on a lead line: the public side is repaired by the department, and a full lead replacement may be scheduled, while the private-side repair remains the owner's unless a replacement program is actually scheduled. The report does not say every leak becomes a free full replacement the same day. Read the program line with the investigator's finding.
The 2025 water service price schedule is a different document. It prices termination of a service, not a household leak repair. For terminations of 2-inch and smaller services, it lists a Department of Water Management inspection fee of $710 on regular time, 7 a.m. to 3 p.m., and $1,420 outside those hours, per service or stub. A re-inspection fee of $500 is also on that schedule. Court-ordered or city-ordered demolition terminations are listed at $16,250 for a 2-inch-and-smaller service off a 12-inch-or-smaller main, and $20,140 for 3-inch and larger, off a 12-inch-or-smaller main. Those are termination prices. They are not the cost of fixing a leak in a parkway.
The Chicago waiver that is not a free replacement
The 2025 water quality report describes the homeowner-initiated lead replacement as a waiver of standard permit fees of up to $5,000. It says this is the only city program that is not free to residents. Eligible properties include rentals, owner-occupied buildings, and commercial properties. The owner pays for the full replacement, hires a licensed plumbing contractor, and the contractor tells the Department of Buildings the project qualifies and applies at the permit address the report prints, ChicagoWaterQuality.org/LSLRpermit. Material can be checked through the identification steps at ChicagoWaterQuality.org/LSLIdentification.
Section 2-8-065 of the municipal code, as cited on the 2025 fee schedule, says service termination and service installation fees are not waived except by an ordinance that specifically authorizes the waiver. The lead-program waiver is a specific program. It is not a reason to assume a demolition termination fee disappears.
The quote worksheet will show the waiver as a labeled figure and will not subtract it. If your leak is on the private side and you are not in a free replacement, the plumber's number is the number that matters, and it is yours to type.
Before you call Chicago Department of Water Management
- Call 311 and let a water-department investigator say whether the leak is public or private.
- Look up the address at SLI.ChicagoWaterQuality.org before you treat a pre-1986 house as a confirmed lead line.
- Ask which lead program, if any, covers this building. Do not assume the homeowner-initiated path is free.
- If you pay for a full lead replacement yourself, ask the contractor about the permit-fee waiver of up to $5,000. Do not deduct it from the bid in advance.
- Do not use the termination inspection fees, $710 and $1,420, as a leak-repair price. They are on the termination schedule.
The homeowner-initiated replacement is not the free program. The 2025 water quality report says it waives standard permit fees of up to $5,000, and that this is the only one of the city's programs that is not free to residents. The owner still pays for the full replacement. Do not subtract the waiver from a plumber's quote. It is a fee the city says it will not charge, not a payment toward the trench.
The comparison table puts this split next to the other places we have sourced. The method explains why a city with no page is left out.
Rules that do not match Chicago
- Detroit: DWSD maintains the service to the curb stop; the owner takes it from there.
- Cincinnati: The code repairs the branch without charge to a valve or a point behind the curb, and the owner keeps the rest.
- Washington, D.C.: The owner owns the whole service; DC Water maintains the public-space portion.